繁體中文English
Industry news POSITION:Home > News > Industry news
  • Company news
  • Industry news
  • Special report
  • Technical support
  • The specific maintenance automation of coating equipment and instructions
  • time:24-05-16  Category:Industry news    Click:59
  • A, painting line

    The 1.1 painting the blast, exhaust pipe should be checked every day the seal, not Water Leakage, leakage.

    The 1.2 chamber body top filter cotton is subject to regular inspection, timely remove dust or replace. Clean up once every March, replaced once a year.

    1.3 in the circulating water tank regularly adding coagulant for paint fog, filter, water tank, grid should be cleaned regularly (every week). Lacquer mist coagulant every two months on a.

    1.4 fan belt every six months to replace a (also visible production circumstances).

    1.5 polishing cleaning indoor filter bag every two weeks to clear a (also visible production circumstances).

    Using the 1.6 painting fan motor lubricating way (Huang You) cup per month to a circle (cup in a timely manner to gas), add lubrication oil every three months refueling time, beating Huang You lubrication gas once every two months.
     

    Two, product chain

    2.1 store chain guide roller and butter lubrication once every half a year (in batches of).

    2.2 store chain trolley duckbill head with butter lubrication once every half a year.

    The 2.3 store chain spray lubrication spray lubrication once every week, time shall not be less than four hours. (domestic demand timely replenishment of oil tank).

    The 2.4 store chain tensioner driving devices are respectively fixed bolts inspected once a month

    The 2.5 plot chain sprocket is connected and fixed bolts should be every day to observe the operating conditions.

    Three, the ground chain

    3.1 the ground chain drive sprocket drive station monthly lubricate a chain of transmission, every two months, add oil a.

    3.2 the ground chain cover every week check once, such as the need for timely cover deformation leveling.

    3.3 the ground chain car fixed pin check every day, every car in the assembly on the first check whether the chain drive position fixing pin at.