  • Cooperate with the establishment of the new factory, integrate two old lines and update the production process

    The establishment of a new factory is an opportunity to reorganize the production process. The client in this case mainly produces iron furniture, constructs a new line while increasing production capacity, and improves pre-treatment operations and on-site maintenance methods.

    Based on the customer's product and new factory conditions, Zhuming plans an automated coating line, connects pre-processing to the conveying process, and matches the fuel usage conditions of the factory to configure a biomass pellet combustion furnace.

    From manual soaking to automatic pre-treatment after feeding

    In the past, operators needed to operate machinery to immerse workpieces into pre-treatment tanks, and then hang them onto conveyor lines after completion. Before the workpiece enters the painting process, there are still multiple steps that require personnel intervention.

    The new production line will adopt automatic spray pre-treatment. After the personnel hang the workpiece and load it, it is transported into the equipment by the conveying system for processing and continues with the subsequent process.

    This change simplifies the original soaking and hanging operations, reduces the operational burden on personnel, and makes the pre-treatment area easier to clean and maintain.

    Choose a suitable heating method in accordance with factory conditions

    The customer's factory also has a wood processing process, so in the discussion of heating methods, the convenience of obtaining and using wood fuel is also taken into account.

    In this case, a biomass pellet combustion furnace is selected to match the customer's existing fuel conditions, reduce some of the subsequent heating costs, and enable equipment planning to simultaneously consider production and long-term usage needs.

    Integrate the production line and drive the improvement of work methods

    Integrating two old lines into one automated painting line, this project not only aims to increase production capacity, but also focuses on improving the actual daily operations: reducing pre-processing steps, reducing personnel burden, and making site maintenance more convenient.

    Starting from these on-site requirements, Zhuming plans the process, equipment configuration, and heating method together to assist customers in establishing a more coherent painting process in the new factory.



    Are you planning a new factory or considering integrating existing coating production lines? Welcome to discuss your product and production needs with Zhuming.